Cubic Feet, Cubic Yards and Cubic Metres: Converting Job Volumes
Bags are labelled in cubic feet, trucks deliver cubic yards or cubic metres, and depth is in inches or millimetres. These are the conversions that tie them together.
How much paint, flooring, concrete or mulch you need, and how to measure for it.
Bags are labelled in cubic feet, trucks deliver cubic yards or cubic metres, and depth is in inches or millimetres. These are the conversions that tie them together.
A wall needs a fixed number of bricks or blocks per unit of area once you include the mortar joint. Work that number out once and the rest is multiplication.
Concrete is bought by volume, and every shape reduces to length times width times depth. Here is how to get the number, turn it into bags, and avoid ordering short.
Paint quantity comes down to surface area, number of coats and the coverage printed on the can. Here is the method, with a full worked example.
Dividing room area by tile area gives a minimum, not an order. Counting rows and columns, then adding waste, gives a number you can actually buy.
You can estimate roof area from the ground: measure the footprint, multiply by a factor set by the pitch, and add an allowance for hips, valleys and waste.
Almost any plan can be broken into simple shapes. Learn the four formulas you need, the add-or-subtract trick, and a method for curved edges.
Flooring is sold in boxes or rolls, not exact areas. Measure the room in sections, add a waste allowance for the layout, and round up to whole boxes.
Landscaping materials are measured in cubic yards but areas are measured in square feet. One formula links them, and one short table covers most jobs.
Every building job loses some material to cuts, breakage and uneven ground. A waste allowance is the extra you add so the project does not stop halfway.